Projects to be solicited in 2022
Under $25 million
Project |
Method |
Agency |
---|---|---|
HVAC: East New York & Queens Village Depots |
DBB (A+B) |
NYCT |
Lighting: Fresh Pond Yard |
DBB (A+B) |
NYCT |
Elevator Replacement: Kingsbridge & Michael J. Quill Bus Depots |
DBB (A+B) |
NYCT |
Substation Component Renewal: Supervisory Control and Data Acquisition (SCADA) at Jamaica Central Control (JCC) |
Design Build |
LIRR |
Motor Generators: Hillside & Babylon |
Design Build |
LIRR |
Private Branch Exchange (PBX) Replacement: 18 Locations System-wide |
Design Build |
MNR |
Replacement of Node House Roofing System: 23 Locations System-wide |
DBB (A+B) |
MNR |
Rock Slope Remediation: East of Hudson |
DBB (IFB) |
MNR |
Stairs & Ceiling Replacement: Penn Station Platforms 7 & 8 |
DBB (A+B) |
LIRR |
Test Pits: Various Locations System-wide |
DBB (IFB) |
NYCT |
Sandy Resiliency 4 Pump Rooms: Jerome/Pelham Tube |
DBB (A+B) |
NYCT |
Boring Services: Brooklyn, Queens, & Staten Isl& |
DBB (IFB) |
NYCT |
Boring Services: Manhattan & the Bronx |
DBB (IFB) |
NYCT |
Component Repairs: 207 St Overhaul Facility |
DBB (A+B) |
NYCT |
Fan Plant Computer Aided Decision Support (CADS) Pilot: 8 Fan Plants / Nassau Loop |
Design Build |
NYCT |
Boiler Replacement: LaGuardia & Spring Creek Bus Depots |
DBB (A+B) |
MTAB |
Chassis Wash & Platform Lift Replacement: Tuskegee & West Farms Bus Depots |
DBB (A+B) |
NYCT |
Electronic Security System: West 4 St / Washington Sq |
DBB (A+B) |
NYCT |
Facade Repairs: Baisley Park, JFK, & LaGuardia Bus Depots |
DBB (A+B) |
MTAB |
Generator Replacement: Spring Creek & College Point Bus Depots |
DBB (A+B) |
MTAB |
Structural Steel & Concrete Repairs: Queens Ramps - Throgs Neck Bridge |
DBB (A+B) |
B&T |
Rehabilitate Pump Room: Adams St / Broadway Line |
DBB (A+B) |
NYCT |
Roof Topping & Expansion Joints: Michael J. Quill Bus Depot |
DBB (A+B) |
NYCT |
Sandy Mitigation: Steinway Tube |
DBB (A+B) |
NYCT |
Between $25 million and $100 million
Project |
Method |
Agency |
---|---|---|
Bridge Rehabilitation & Overcoat, & Station Component Repairs, Staten Island Railway |
Design Build |
NYCT |
Lower Level Deck Rehabilitation, Painting, & Weigh-In-Motion Installation: Verrazzano-Narrows Bridge |
DBB (A+B) |
B&T |
Early Works/Utility Relocation: Second Avenue Subway Phase 2 |
DBB (A+B) |
C&D |
Reconstruction & Widening: East Bound Merge from Verrazano-Narrows Bridge |
DBB (A+B) |
B&T |
Replacement of 3 Substations: Jamaica, Winfield, & Grand Av |
Design Build |
LIRR |
HVAC, Fire Control, & CNG Upgrades: Spring Creek & College Point Bus Depots |
DBB (A+B) |
MTAB |
Mainline Switch Rehabilitation: Staten Island Railway |
DBB (A+B) |
NYCT |
Rebuild Substations: Mamaroneck & Harrison, New Haven Line |
Design Build |
MNR |
Under River Tube Security Phase 3: 13 Under-River Tubes (All Except 63 St) |
Design Build |
NYCT |
New Substation: 28 St / 8 Av Line |
DBB (A+B) |
NYCT |
Station Platform Component Repairs: 46 St & 36 St / Queens Blvd Line |
DBB (A+B) |
NYCT |
Station Platform Component Repairs: 50 St, 79 St, 86 St, 145 St, & 191 St / Broadway-7 Av Line, & Track Replacement at 86 St |
DBB (A+B) |
NYCT |
Rehabilitation of Circuit Breaker Houses: 5 Locations on the 7 Av, Brighton, & Jamaica Lines, & Livonia & Jamaica Yards |
DBB (A+B) |
NYCT |
Replace Equipment: 9 Substations on the 8 Av, Dyre, Concourse, & Queens Blvd Lines, & Jamaica Yard |
DBB (A+B) |
NYCT |
Replace Electrical/Mechanical Equipment: South Channel Bridge |
DBB (A+B) |
NYCT |
Station Renewals: 85 St-Forest Pkwy, 75 St-Elderts Lane, & Cypress Hills / Jamaica Line |
DBB (A+B) |
NYCT |
Substation Renewals: 3 Locations on the 6 Av, Culver, & Queens Blvd Lines |
DBB (A+B) |
NYCT |
Painting & Structural Repairs: Portal to West 8 St / Culver Line |
DBB (A+B) |
NYCT |
Over $100 million
Project |
Method |
Agency |
---|---|---|
ADA: 168 St / 7 Av-Broadway |
Design Build |
NYCT |
ADA Package 5: 9 Stations various lines |
Design Build |
NYCT |
Platform Screen Doors Pilot: 3 Av-Canarsie Line, Sutphin Blvd-Archer Av-Archer Av Line, 42 St-Times Sq-Flushing Line |
Design Build |
NYCT |
Station Components: 43 Stations various lines |
PDB |
NYCT |
Station Renewal: 5 Stations / Flushing Line |
DBB (A+B) |
NYCT |
Station Platform / Mezzanine Component Repairs: 39 Stations System-wide |
Design Build |
NYCT |
Communications-Based Train Control (CBTC): Fulton Line |
Design Build |
NYCT |
Painting & Structural Repairs: Portal to 24 Av & 9 Av Station / West End Line |
DBB (A+B) |
NYCT |
Projects to be solicited in 2023
Under $25 million
Project |
Method |
Agency |
---|---|---|
Construct Pump Room: Rockwell Place / 4 Av |
DBB (A+B) |
NYCT |
Resiliency Improvements & Perimeter Hardening: Rail Control Center & Power Control Center |
Design Build |
NYCT |
APC Replacement & HVAC: Communications Rooms System-wide |
DBB (A+B) |
NYCT |
Rehabilitate Emergency Exits: 14 Locations System-wide |
Design Build |
NYCT |
Chassis Wash: Grand Av & Flatbush Depots |
DBB (A+B) |
NYCT |
Drainage & Fire Protection: Charleston Bus Depot |
DBB (A+B) |
NYCT |
Upgrade / Replace Elevators: Various Department of Subways Facilities |
DBB (A+B) |
NYCT |
Water Remediation: Atlantic Av-Barclays Center |
Design Build |
NYCT |
Widening: Southbound FDR Drive, 125 St Entrance Ramp to 116 St Exit Ramp |
Design Build |
B&T |
Bridge Structural Lighting & Miscellaneous Structural Upgrades: Throgs Neck Bridge |
Design Build |
B&T |
Weigh-In-Motion Installation: RFK Bridge |
Design Build |
B&T |
Phase 2 Tower Lighting & Electrical Upgrades: Verrazzano Narrows Bridge |
Design Build |
B&T |
Replacement of Grid Decks on Suspended Span, Main Cable Inspection, & Suspender Rope Testing: Throgs Neck Bridge |
Design Build |
B&T |
Yard Lighting / Amenities: Richmond Hill, Upper Holban, and Hillside Facility |
Design Build |
LIRR |
Between $25 million and $100 million
Project |
Method |
Agency |
---|---|---|
New Substation: 225 St, Upper Broadway-7 Av Line |
Design Build |
NYCT |
Passenger ID CCTV: Additional Locations System-wide |
Design Build |
NYCT |
Rehabilitation: Police Facilities 14 St-Union Square & Port Authority Bus Terminal |
Design Build |
NYCT |
Roof Repairs: Various Locations System-wide |
DBB (A+B) |
NYCT |
Emergency Alarms Phase 1: Various Locations System-wide |
Design Build |
NYCT |
Station Renewals: Chambers St / Nassau & 190 St / 8 Av |
Design Build |
NYCT |
Track & Switch Rehabilitation Phase 2: Staten Island Railway Mainline |
DBB (A+B) |
NYCT |
Upgrade Cable Shop Phase 1: Atlantic Av |
Design Build |
NYCT |
Resiliency Improvements: Westchester & Corona Yards |
DBB (A+B) |
NYCT |
Anchorage & Tower Protection: Throgs Neck Bridge |
Design Build |
B&T |
Overhaul & Replace Facility Monitoring & Safety Systems: Various Locations System-wide |
Design Build |
B&T |
Facility-Wide Painting Program: Throgs Neck Bridge |
Design Build |
B&T |
Facility-Wide Painting Program: Verrazzano-Narrows Bridge |
Design Build |
B&T |
Anchorage Rehabilitation: RFK Bridge Wards Island / Queens |
Design Build |
B&T |
Zone/Maintenance Painting of Suspended Spans: RFK Bridge |
Design Build |
B&T |
Over $100 million
Project |
Method |
Agency |
---|---|---|
ADA: Broadway Junction Complex |
Design Build |
NYCT |
Rehabilitation Phase 2: Circuit Breaker House Various Locations System-wide |
Design Build |
NYCT |
Upgrade Public Address / Customer Information Signs (PA/CIS) B-Division: Phase 0 Stations Various Locations System-wide |
Design Build |
NYCT |
Switch Replacements & Interlockings: 6 Av CBTC |
Design Build |
NYCT |
Line Structure Component Repairs, Stormwater Mitigation, & Repair Expansion Joints: Broadway-7Av / 8 Av N ROW |
DBB (A+B) |
NYCT |
Replace Elevators: Systemwide |
Design Build |
NYCT |
Replace Escalators: Systemwide |
Design Build |
NYCT |
Sandy Repairs: Culver Yard |
DBB (A+B) |
NYCT |
Structural Overcoating & Repairs: West End |
DBB (A+B) |
NYCT |
Suspended Span Retrofit: RFK Bridge |
Design Build |
B&T |